Grain silos are widely applied for the storage of grains (sunflower seeds, soy, maize, sorghum, rice, industrial products and other products, etc) and feed pellets for animal, poultry and fish that require special storage conditions. They can also provide temporary storage of wet grain as part of a grain drying plant and other buffer bin applications in silo plants.
Today we are mainly talking about the construction of steel silos.
Before the large steel plate grain silo is made, the detailed production process plan, construction machinery and production personnel arrangement, welding materials and other work are prepared according to the technical drawings. Relevant personnel to carry out technical exchange arrangements. When the materials arrive at the site, they must do a good job of transportation and loading and unloading equipment, and make adequate preparations for the start of the project.
When making and installing large steel plate grain silo, arrange quality inspection work in time, and repair and rework immediately when found unqualified. Record the transition of each process.
The most important thing in the construction of large steel plate granary is the lifting scheme of the warehouse, and most steel plate granary projects are constructed by inverted loading method. First of all, the grain silo floor is laid, and then the top of the first layer of wall panels and the top of the grain silo are prepared, and then according to the diameter of the grain silo and the number of hydraulic jacks, the hydraulic jack is evenly placed in a circle of the grain silo, and the wall panels and the hydraulic jack connecting plates are riveted. Continue to install the hydraulic jack and hydraulic pump station, and connect and drain the oil lines and circuits for commissioning.
Place a jack every 4 meters according to the diameter of the granary (Note: the position of the top can be adjusted according to the width and size of the board)
In order to ensure the quality and quantity of the project successfully completed on time, it is necessary to formulate feasible measures to ensure the construction period. In addition to fully guaranteeing the production, processing, packaging, and transportation links, the following measures will be taken at the installation site: the transportation plan should arrive at the site at least three days in advance to avoid the impact of road obstacles on rainy days. All component numbers are specially checked by inspectors to ensure a successful installation. Strictly complete the daily construction plan workload, do not finish the work, if necessary, can be appropriate to work overtime or even add night shift to complete.