Publish Time: 2024-08-29 Origin: Site
In industrial enterprises and in daily life. Tanks are used as equipment for storing liquids and transporting them. With the expansion of industrial and agricultural production scale and the continuous development of modern cities, the application of storage tank equipment has become more and more extensive, and has become one of the important thermal equipment for the development of national economy. And the container that can store various objects, which is indispensable in society, is now being used by society, and it is still developing at a rapid rate.
The flip method hydraulic lifting construction technology can be used for the flip construction of metal cylindrical and polygonal storage tanks with a volume of thousands of cubic meters to tens of thousands of cubic meters. It can be a vaulted tank, a floating tank or an internal floating tank. It can be a new storage tank, or an old tank can be updated to replace the bottom plate and foundation repair.
The processing accuracy of the loose card jack is relatively high, the performance of each jack is relatively close, and the hydraulic control system is used for unified control, and the model can be adjusted individually or locally (several), so that the lifting speed and synchronization are more consistent, so the whole lifting process is relatively stable.
Due to the characteristics of the loose clamp jack's own mechanism, its self-locking performance is good, and it will not cause the tank to slide or fall due to power failure or the need to stop lifting during the lifting process, so the hydraulic lifting process is safe and reliable.
Hydraulic lifting construction must use the expansion ring to expand tight wall, so its roundness is good, the wall ring joint group is easy to find the right time; Under the action of the reexpansion ring, due to the greatly increased stiffness of the wall panel, the welding shrinkage deformation of the ring joint is small, and the flatness is good: the loose clamp jack has an adjustable (slight drop) lifting height can be more accurate control. Because of the above reasons, the welding quality of the tank can be guaranteed.
The complete set of hydraulic lifting equipment has a high degree of modernization, and is easy to operate, avoiding the return or noise of the previous blast or mechanical operation, and improving the construction environment. It can be constructed all day, eliminating the highly tense mental pressure of workers, reducing the labor intensity of workers, and improving work efficiency.
The complete set of equipment is used in the hydraulic lifting construction of both the arch roof tank and the floating roof tank.
Due to the high degree of modernization of the complete set of equipment and the fast lifting speed, the net lifting time of a layer of siding (height 1.8-2.2m) is only 20~ 30min, which can shorten the construction period; High-altitude operation is changed to ground operation, which can save the cost of crane and scaffolding; Reduce the operator, save additional labor costs, so the construction cost is low, good economic benefits.