This browser does not support the video element.
For the tank welding machine, we has been sold more than 20 countries in more than 1000 projects sites.We have confidence for the machine quality and after sale service. We can provide single side, double side crude oil, LNG tank, fuel tank, water tank horizontal seam, vertical seam and bottom plate/corner welding machine.In Middle East, we have sold to UAE, Saudi Arabia, Oman, Bahrain, Kuwait. In Africa, we have sold machine to Cameron, Sudan, Egypt, Senegal, Nigeria,Zambia,Ethiopia,Senegal,etc. We have sold to vietnam, Indonesia , Malysia,Philippines,Singapore, Mexco,Mogulia, Russia,etc
Welding Process | SAW |
Model | MSHW-I |
Plate Thickness | 8 – 45mm |
Plate Material | Carbon steel, Stainless Steel |
Groove | K groove |
Seam Position | Girth weld |
Min Tank Diameter | Φ5.0m |
Plate Width | 1.5 – 2.5m |
Power Input | 380V/3PH/50HZ |
Erection Method | Bottom To Top |
Dimension(L x W x H) | 1460mm x 988mm x 2760mm(if design change, will as per new design) |
Gross Weight | 800kg |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.
Based client’s facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.
To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
1, Support you to win the project during bidding phase. We can provide your more suitable configurations to help you shorten the constrcution time.
2, We can provide all technical documents and advices to support you for construction procedure clearifications
3, We can support you to calculate the roughly construction time based one welding efficiency, the calculation of manpower needed, welding consumbles quantity
4, We can provide your suitable welding consumbles with much more competetive price from our long time business partner if you need.
5, We can provide site people training service, and operation service or manpower service or as a subcontractor.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong