Availability: | |
---|---|
Quantity: | |
NSHW-I
WINCOO
WINCOO Engineering offers the Automatic Girth Welder for tank fabrication applications.Unlike current girth welders on the market,the MSHW series comes standard with a Dual Drive System.This self-propelled submerged arc welding system can reduce field storage tank welding time up to 40%.Weld defects are greatly reduced,saving tank erection costs.The Girth Welder is applicable for top down or bottom up construction single or double wall storage tanks for inside and outside welding.There are four standard units,however our design allows us to offer custom built units for non-standard application.
Product Description
Scope of application:
1, Suitable for input 380V+10%/3PH/50Hz, Bottom-to-Top and Top-to-Bottom storage tanks.
2, Adaptation plate thickness: 8 - 45mm
3, Applicable diameter: above 5m
4, Adaptive plate width:
Bottom-to-Top: 1.5m - 3.2m
Top-to-Bottom: 1.6m - 2.6m
5, Suitable for steel grades: carbon steel, low alloy steel, high strength steel, stainless steel, etc.
6, Suitable for groove: Type K, V and X.
7, Suitable for welding position: girth seam butt joint
8, Suitable for welding wire diameter: Φ 2.4 – 4.0mm
Welding Process | SAW |
Model | MSHW-I |
Plate Thickness | 8 – 45mm |
Plate Material | Carbon steel, Stainless Steel |
Groove | K groove |
Seam Position | Girth weld |
Min Tank Diameter | Φ5.0m |
Plate Width | 1.5 – 2.5m |
Power Input | 380V/3PH/50HZ |
Erection Method | Bottom To Top |
Dimension(L x W x H) | 1460mm x 988mm x 2760mm(if design change, will as per new design) |
Gross Weight | 800kg |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong