+86-15358182650
/
/
/
/
/
/
/
/
/
/
Home / Products / other products / China Automatic Horizontal Girth Welding Machine for Tank Construction

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

China Automatic Horizontal Girth Welding Machine for Tank Construction

Color:Customized
Material:Stainless steel
Min order:1
Availability:
Quantity:
  • MSHW-I-Z/D

  • WINCOO

Product Description

For the tank welding machine, we has been sold more than 20 countries in more than 1000 projects sites.We have confidence for the machine quality and after sale service. We can provide single side, double side crude oil, LNG tank, fuel tank, water tank horizontal seam, vertical seam and bottom plate/corner welding machine.In Middle East, we have sold to UAE, Saudi Arabia, Oman, Bahrain, Kuwait. In Africa, we have sold machine to Cameron, Sudan, Egypt, Senegal, Nigeria,Zambia,Ethiopia,Senegal,etc. We have sold to vietnam, Indonesia , Malysia,Philippines,Singapore, Mexco,Mogulia, Russia,etc.

Product parameter

Model

MSHW-I-Z/D

Welding Currency

80-800A

Welding Voltage

20-45V

Welding Speed

200-650mm/min

Power Input

380/3PH/50Hz

Rated power

25kw
GrooveV/K Groove

Position

Horizontal seam(2G)

Full traveling speed

2650mm/min

Tank Dia5.0m and above

Wire Dia

Φ2.0mm-Φ4.0mm

Plate Thickness

8-45mm

Shell width

bottom-to-top 1.5-3.0m

Torch adjustment

3 axi

Torch up/down adjustment

±25mm

Torch fwd/rev adjustment

±25m

Capacity of flux container

60kg



Major component

勒肯横焊机内部细节图

Product pictures

勒肯横焊机工厂图片勒肯横焊机现场图片

Company profile

Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.

What can we do for you?

1, Support you to win the project during bidding phase. We can provide your more suitable configurations to help you shorten the constrcution time.
2, We can provide all technical documents and advices to support you for construction procedure clearifications
3, We can support you to calculate the roughly construction time based one welding efficiency, the calculation of manpower needed, welding consumbles quantity
4, We can provide your suitable welding consumbles with much more competetive price from our long time business partner if you need.
5, We can provide site people training service, and operation service or manpower service or as a subcontractor.

Previous: 
Next: 

Get A Free Quote

Get A Free Quote

Please contact us with any questions you may have by filling out and sending the form below.

Consideration on behalf of client is our ethic and responsibility

 

View More >

QUICK LINK

PRODUCT LIST

Sign up for our newsletter to receive the latest news.

​Copyright © 2020 WINCOO ENGINEERING CO.,LTD

Support By:Leadong