The transportation volume of pipeline transportation is large. Most of the pipeline is buried in the ground, which covers less land and is less constrained by terrain and objects, thus shortening the transportation distance.Sealed transportation, safe and reliable, long-term continuous and stable operation;Easy to manage, easy to realize remote centralized monitoring.
Pipeline construction process
Surveying and setting out→and cleaning the construction work belt;To construct the construction road→to transport the anticorrosive pipe→to process the groove→to redistribute the pipe→to prepare the pipe mouth;Pipeline fitting-up→pipe fitting-up and welding→welding joint inspection→heat shrinkable sleeve (tape) bushing→trench excavation→pipeline trench→pipe fitting-up;Pipeline welding→welding joint inspection →cleaning and pressure test→pipe trench backfilling→geomorphologic restoration.
Equipment needed in the process:
1. Transport the anticorrosive pipe
2. Pipeline fitting-up
3. Pipe fitting-up and welding
4. heat shrinkable sleeve (tape) bushing
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong