This browser does not support the video element.
Hydraulic jacking system is an important machine for tank construction. The equipment is mainly used for inverted construction of vertical cylindrical steel tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature tank.
Item/Model | YT10-1650 | YT10-1700 | YT12-2700 | YT18-1700 | YT25-3200 | YT25-2700 | YT30-2700 | YT30-3200 | YT40-3400 | YT50-2700 |
Maximum service pressure | 28 MPa | 28 MPa | 13Mpa | 30Mpa | 20Mpa | 25Mpa | 24Mpa | 30Mpa | 20Mpa | 10Mpa |
Maximum output force | 10 t | 10 t | 12 t | 18 t | 25 t | 25 t | 30 t | 30 t | 40 t | 51 t |
Maximum stroke | 1700 mm | 1700 mm | 2700 mm | 1650 mm | 3200 mm | 2700 mm | 2700 mm | 3200 mm | 3400 mm | 2620 mm |
Lifting speed | 90mm/min | 90mm/min | 160mm/min | 95mm/min | 180mm/min | 180mm/min | 110mm/min | 50mm/min | 80mm/min | 140mm/min |
Oil pump flow | 2×14.4L/min | 2×14.4L/min | 50L/min | 7.2L/min | 14.4L/min | 14.4L/min | 7.2L/min | 7.2L/min | 7.2L/min | 14.6L/min |
Motor speed | 1440r/min | 1440r/min | 1440r/min | 1440r/min | 1440r/min | 1440 r/min | 1440r/min | 1440r/min | 1440r/min | 1440r/min |
Motor voltage | ~380 V | ~380 V | ~380 V | ~380 V | ~380 V | ~380 V | ~415V | ~380 V | ~380 V | ~380 V |
Motor power | 2×5.5kw | 2×5.5kw | 15kw | 4kw | 5.5kw | 5.5kw | 4kw | 4kw | 4kw | 5.5kw |
Working environment temperature | -15~50 ℃ | -15~50 ℃ | 10~50 ℃ | 10~50 ℃ | -10~60 ℃ | 10~50 ℃ | -10~50 ℃ | 0~50 ℃ | 0~50 ℃ | 0~50 ℃ |
Suitable width | 1500mm | 1500mm | 1500mm | 1500mm | 3000mm | 2500mm | 2500mm | 2500mm | 3050mm | 2500mm |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
Our Services & Strength
*We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.
*Based client’s facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.
*To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong