How to inspect the quality of pipeline construction equipment?

Views: 0     Author: Site Editor     Publish Time: 2021-05-05      Origin: Site

The installation of pipeline construction equipment is one of the necessary parts in the pipe construction solution, and the installation and construction of pipeline construction equipment is a very important stage in project construction. Due to various factors in the project construction, there are many problems in the installation of pipeline construction equipment. To promote the improvement of the quality of industrial pipeline installation, certain measures need to be taken to control the installation quality of pipeline construction equipment to ensure the smooth construction of the project.

 

Here is the content list:

l Regarding the quality inspection of pipeline construction equipment installation.

l What are the quality control measures in the installation of pipeline construction equipment?

l Regarding the quality control of pipeline construction equipment after construction.

 

Regarding the quality inspection of pipeline construction equipment installation.

The sequence of installation of pipeline construction equipment is:

Measuring arrangement→cleaning the construction work area; construction road→conveying anticorrosion pipe→processing tank→distributing pipe→preparing nozzle; pipeline assembly→pipe assembly and welding→welding joint inspection→heat shrinkable casing (tape) bushing→ trench excavation →Appearance repair .

 

After the installation of pipeline construction equipment is completed, quality inspection is required. After pipeline construction equipment is installed and put into use, regular monitoring is required. Generally, radiographic inspection is used to inspect the quality of pipeline installation. This monitoring has a very good effect on the internal inspection of welded joints. It is widely used in the field of construction equipment installation. This method can also be used to make the quality of the pipeline meet the assessment standard.

 

What are the quality control measures in the installation of pipeline construction equipment?

l Pre-control of pipeline construction equipment installation:

Before installing pipeline construction equipment, clarify the construction plan of the construction technicians, use GB/T as the standard, and carry out construction in accordance with national standards and specifications; during the installation of pipeline construction equipment, strictly review the drawings for defects to ensure the rationality of the drawings, and the construction unit It is also necessary to make preparations for pipeline installation and construction, pipeline lumber, welding inspection, construction site management, etc.

 

Strictly follow the relevant requirements of pipeline construction equipment and pipeline construction requirements to improve the quality of construction. In order to ensure the quality of pipeline installation, quality control is required for key parts such as welding materials, welding processes, and welding seams to ensure pipeline construction equipment. Welding consumables, brands, specifications, etc. are required by the plan design, which are consistent with the project construction requirements to ensure the quality of installation.

 

l Construction quality control of pipeline construction equipment.

① After the pipes, accessories and raw materials used for pipeline construction equipment enter the construction site, the supervisors shall check and accept them on site, and store the materials after passing the acceptance.

② Pipe joints and semi-finished products of pipeline construction equipment should be guaranteed not to be damaged during transportation and storage. When unloading, handle with care and not collide with each other; choose a flat place for stacking pipe joints.

③ The storage temperature of the rubber ring of pipeline construction equipment is between -5 and 30 degrees Celsius. It should not be exposed to ultraviolet light source and keep away from the heat source; the rubber ring and the items that easily affect the rubber ring should not be put together. If the pipeline construction equipment is being constructed In winter, hard rubber rings are not allowed.

④ For trench excavation in open-cut pipeline engineering, the section should meet the design requirements of construction quality, the original soil at the bottom of the trench should not be damaged, and the mechanical excavation should reserve a 200-300mm soil layer for manual excavation and leveling, and the bottom of the trench can be soaked by water And frost damage, if there is gravel soil, lime soil to backfill, the trench wall should be leveled to meet the requirements of construction design.

⑤ For concrete construction, when the pipe seat and flat foundation are poured in layers, the flat foundation should be shaved and rinsed; the concrete should be prevented from segregation, and the concrete should be cured after pouring.

⑥ When pipeline construction equipment is installed, visual inspection and internal cleanliness of the pipeline must be inspected.

⑦ The flexibility of pipe joints must meet the design requirements, and the rigidity must also meet the requirements.

⑧ In the stage of backfilling, the backfill height between both sides of the pipe and the top of the pipe before the hydraulic test of the pressure pipeline is greater than 0.5M, and the pressure-free pipeline shall be backfilled after the closed water test and the closed gas test have reached the standard.

 

Regarding the quality control of pipeline construction equipment after construction.

After the completion of the pipeline construction equipment, the finishing work will begin. The unit needs to organize personnel to review the material documents involved in the pipeline installation, project reports, etc.; after the completion of the project, debugging and quality appraisal are required, and the pipeline professionals are organized to conduct quality appraisal of the installed pipelines. The dynamic control of the links will protect the completed pipelines.

 

In the later stage of the installation of pipeline construction equipment, in order to ensure the smooth completion of the project, the quality of the pipeline needs to be tested again to ensure that the pipeline installation does not have problems such as tilt and cracks, the welding parts are of good quality, and the pipeline is unobstructed. In the later period after the completion of the project, it is necessary to sort out each project data and work files involved in the pipeline construction, do a good job of archiving and backup to evaluate the quality of the pipeline, do a good job in risk control, and carry out the acceptance of pipeline construction equipment.

 

There are many influencing factors in the installation of pipeline construction equipmentt, so reasonable measures need to be taken to monitor and control every aspect of pipeline construction equipment. With the continuous expansion of the pipeline construction equipment construction industry, the use area is also expanding. Due to the importance of pipeline use, it is necessary to control the pipeline installation quality to ensure that the installation quality reaches the ideal standard!


What is more? WINCOO provide not only pipeline construction solutions, but also pipe spool fabrication solutions for customers from everywhere!

Consideration on behalf of client is our ethic and responsibility

 

View More >

QUICK LINK

PRODUCT LIST

Sign up for our newsletter to receive the latest news.

​Copyright © 2020 WINCOO ENGINEERING CO.,LTD

Support By:Leadong